Examinando por Autor "Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]"
Mostrando 1 - 13 de 13
- Resultados por página
- Opciones de ordenación
Ítem Análisis de costos para un proyecto de vivienda de interés social en Bogotá según guía PMBOKFuentes Dallos, Victor Alfonso; Lugo Gómez, Yonatan Alexander; Herrera Naranjo, Carlos Fabian; Pineda Jaimes, Jorge Arturo; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]The objective of this degree work is to carry out a cost analysis for a social housing construction project called Parque Primaveral in the city of Bogotá, using as a frame of reference the Guide to the Fundamentals for Project Management (Guide to the Project). PMBOK) from the Project Management Institute (PMI). To carry out this analysis, the earned value technique (Earned Value Management - EVM) widely described in the PMBOK Guide will be applied, which allows evaluating the performance of the project in terms of cost and time. Specifically, the study will focus on the analysis of the foundation and structure activities for all of the project's towers, taking into account that these chapters are framed within the critical path and represent close to 60% of the direct costs. Based on the EVM methodology, schedule and cost performance indices will be calculated, as well as their variations and forecast indicators, in order to characterize the variations with respect to the budget and schedule initially planned in the project. Subsequently, these deviations will be compared in relation to all the project units, to contextualize the results obtained and finally, based on the calculated indices, recommendations and lessons learned will be proposed that can contribute to knowledge in the effective management of housing projects. social interest in the city of Bogotá. Although the project has a well-defined scope and is based on a standard methodology such as EVM, some limitations are expected related to the reliability and transparency of the data, the possibility of extrapolating the results, the experience required in EVM and comparability with other projects.Ítem Análisis de criterios de sostenibilidad aplicados en la gerencia de proyectos de infraestructura vial en ColombiaRodríguez Santos, Edwin Fabián; Sánchez Galindo, Daniel Estiben; Pineda Jaimes, Jorge Arturo; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]This degree work corresponds to a monograph, whose purpose is to carry out an analysis of the implementation of sustainability in road infrastructure projects, mainly in the context of the construction sector in the national territory. As a first step for the development of the monograph, a bibliographic search of the cases of application of sustainability criteria in the road infrastructure construction sector was carried out; process that resulted in the identification of six (6) evaluation methodologies at the international level and three (3) sustainability guides applied at the national level; Through a comparative analysis of these methodologies and guides, those common sustainability criteria that are applied in road infrastructure projects were established. After identifying the sustainability criteria applied in road engineering, it was proposed to carry out a survey of professionals involved in the development of this type of project, with the aim of knowing the perception regarding the level of implementation of these criteria in the projects in question. who participate or have participated. Once the degree of application of the sustainability criteria for road infrastructure projects was known, a series of recommendations were formulated to be taken into account by the professionals in charge of directing and managing projects, in order to integrate the three pillars of sustainability (economic, social and environmental) and offer an interesting alternative for optimal planning, execution, management, control and evaluation of road engineering projects in Colombia.Ítem Análisis de riesgos en un proyecto de optimización de redes de acueducto y alcantarillado. Caso de estudio barrio Porvenir Río y Villa Lady, MosqueraInfante Molina, Camilo Andrés; González Castellanos, Hansel Stiven; Pineda Jaimes, Jorge Arturo; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]This monograph focuses on an aqueduct and sewer network installation project in the assignment phase, using a risk analysis approach based on the parameters established in the PMBOK guide. To this end, crucial information is gathered through historical facts, background information and relevant literature, with the objective of performing a more accurate and informed analysis in the selection of significant risks for the project in question. Subsequently, a qualitative analysis of the identified risks is carried out, using the probability and impact method, the importance of which is highlighted in the development of this document. After this phase, we proceed with the quantitative analysis of the risks, implementing the Monte Carlo method with the support of the Crystal Ball tool. This comprehensive approach allows a well-founded evaluation of the possible risks associated with the project. Finally, the respective analysis of the results obtained will be carried out, leaving this document as working material for similar case studies or projects of the same nature.Ítem Análisis de riesgos financieros a través de la implementación de la guía del Project Management Institute. Estudio de caso: Centro de distribución logístico en Palmira - Valle del CaucaRamírez León, Jorge Andrés; Ortiz Ramírez, Diego Fernando; Pineda Jaimes, Jorge Arturo; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]The analysis of financial risks in the construction sector has become a fundamental part of the development of infrastructure projects. In Colombia, the structuring of projects associated with risk management has been directly linked to the planning and establishment of possible financial events that positively or negatively affect the life cycle, regardless of the relevance of components such as magnitude, influence and social impact. The content of this document develops the financial risk analysis focused on a real project, with a particular focus associated with the execution stage in the construction of a logistics distribution center in Valle del Cauca. Applying the guidelines established in the PMBOK guide, 6th edition, which establishes the foundations for project management established by the Project Management Institute, specifically in the management of risk associated with projects with a financial focus.Ítem Análisis del grado de madurez en la gestión de proyectos en una mediana empresa de construcción en la ciudad de Bogotá D.C.Roncancio Cabrejo, Nancy Viviana; Correa Mora, Ana María; Cubillos Rojas, José Luis; Pineda Jaimes, Jorge Arturo; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]The study aimed to evaluate a medium-sized construction company's project management maturity in Bogotá, D.C., using the ISO 21502 standard as a benchmark. Surveys were conducted across different hierarchical levels, revealing a medium-low maturity level and signaling the need for substantial internal practice improvements. Consideration of the company's growth conditions led to the selection of ISO 21502, a flexible standard accommodating organizational specifics. Tailored construction sector surveys pinpointed areas for enhancement. The findings informed an action plan focusing on standardizing processes. This work underscores the significance of implementing optimal project management practices to elevate maturity levels and efficiency in construction.Ítem Análisis financiero de tecnologías de construcción sostenible implementadas en acreditación EDGE para proyectos de vivienda en la ciudad de BogotáVargas Cardona, Jan Stevens; Gutiérrez Galindo, Leidy Viviana; Steer Vargas, William Leonardo; Pineda Jaimes, Jorge Arturo; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]This document presents an analysis of three construction projects in Bogotá that have, in their design phase, the EDGE sustainable construction certification and the incorporated technologies that pursue the certification already mentioned in each of them . A scenario is proposed where these technologies are not used but where traditional technologies are used that offer greater profitability per unit purchased from the executor of the work and a cost comparison is made that shows the relationship between that scenario and the one where there was incorporation of technologies. sustainable. All this focused on presenting data that allows investors in housing projects with a certification option to choose to execute them using the results shown here; It was found that the percentages of cost overruns if a budget that does not involve sustainable technologies is taken as a basis vary depending on the type of project, showing more favorable results for VIS projects.Ítem Aplicación de lineamientos del PMBOK 6ta edición en el estudio de prefactibilidad para proyecto de reubicación de viviendas en zona de alto riesgo por inundación y avenidas torrenciales – estudio de caso: Cabrera, CundinamarcaRojas Porras, Luisa Julieth; Moreno Romero, Oscar Julián; Pérez Baena, Alejandro José; Pineda Jaimes, Jorge Arturo; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]The following monograph considers the pre-feasibility study for the relocation of housing in the urban area located in a high-risk area due to flooding and avenues torrential in the municipality of Cabrera, Cundinamarca, implementing the fundamentals and best practices for project management from the Project Management Institute PMI contemplated in the PMBOK 6th edition. To establish the pre-feasibility of the study of case, the diagnosis of the context was made, the technical feasibility was determined and the preliminary budget, of this risk mitigation measure applying the guidelines of the PMBOK in the initiation and planning process groups, especially in the areas knowledge of Scope Management, Stakeholder Management, Schedule Management, Resource management, Risk management and Cost management. As a result, it was obtained that there are currently 84 homes that should be prioritized for a relocation project housing, which can be developed on a property that met the highest rating after the multicriteria evaluation carried out, in the same way a duration of 2 and a half years to execute the project with a preliminary cost of approximately 16 billion pesos which includes activities such as: project management, purchase of land, expansion of aqueduct and sewage networks, construction of vis housing, road infrastructure and public space, demolition of homes at risk and restoration of the relocated space.Ítem Creación de una aplicación móvil (prototipo), para la generación de indicadores de avance en proyectos de construcción de vías urbanasCarrillo Pineda, Andrés Javier; Rivera Pardo, Jeison Takeshi; Velasco Guevara, Christian Mauricio; Pineda Jaimes, Jorge Arturo; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]This degree work is based on the creation of a mobile application prototype that provides progress indicators in the execution of urban road construction projects. For the elaboration of said prototype, it began with the selection of the indicators that the application will throw, in accordance with the analysis carried out on the existing methodologies and systems that provide indicators in the projects. Subsequently, an investigation was carried out on the area of mobile programming, in order to know the tools and mechanisms to be used in the elaboration of an application prototype. Once the application prototype was developed, a comparison was made with the Microsoft Project program, in the execution of an urban road project, to find out the benefits it would bring in the monitoring and control of projects. Finally, a user manual was created, where each of the actions that must be carried out for a correct and normal functioning of the prototype is described.Ítem Identificación de criterios para aplicar sostenibilidad en la etapa de planeación de proyectos de infraestructura vial en Colombia, bajo la guía PMBOK sexta ediciónLaverde Acevedo, Julián Alejandro; Aguilar Castañeda, Catherine Gisella; Mendivelso Pérez, Miguel Ángel; Pineda Jaimes, Jorge Arturo; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]Road infrastructure is part of the great pillars that drive the economic development of society; because it allows the circulation, transportation and movement of communities, generating accessibility and greater competitiveness of nations. Over the years, road infrastructure has faced different challenges and challenges, which has allowed it to be in constant evolution and change in order to adapt to each of the needs of the surrounding environment and align with growth and development. international; In Colombia, in 1992, road Megaprojects began with what are called first-generation roads within the framework of national development plans. The study of highway projects internationally during the last decades has allowed us to analyze each of the economic, environmental and social criteria which make up the concept of sustainability. The large metropolises where the largest amount of production is concentrated have chosen to implement new methodologies so that their processes are developed more efficiently and in this way contribute to the reduction of environmental impact with the aim of conserving and caring for the environment. As indicated by Aponte Páez, (2007): Urban planning focused on the present and future of the city concept has generated a series of needs where it seeks to interrelate environmental, social and economic factors, which makes these projects have a sustainable and environmentally friendly approach. Colombia, due to its geographical and topographic characteristics where we find three large mountain ranges, diversity of thermal floors, fauna and flora, has faced large highway projects that have allowed it to include planning models for its implementation. Currently, these types of projects are evolving to what we know as fifth generation roads (5G) where, through public-private concessions, important engineering works are sought to be launched, mitigating the environmental impact with the reduction of emissions. carbon dioxide to the environment, in addition to the sustainable financing of the project through green bonds that allow the environment to be compensated for the impact caused by the intervention and execution of the project. By nature, these types of projects are characterized by their breadth and complexity in the execution stage, therefore, they require correct planning at the beginning of the project life cycle; The PMBOK guide, sixth edition, is one of the tools that allows us to focus and direct projects in each of the process groups with the objective of clarifying and breaking down each area of knowledge involved. The ten areas of knowledge are immersed in project planning, from project integration management to project stakeholder management; In this way, the twenty-four processes must be specified, returning partial deliverables that approve and enable the process and in this way continue with the group of execution processes.Ítem Implementación de los lineamientos del PMI enmarcados en la guía PMBOK 6ª edición en la etapa de construcción de la Casa de la Cultura, localizada en el municipio de Acacías, MetaRomero Guevara, Natalia; Alférez Chica, Nathali Paola; Rey Agudelo, Esnel Genaro; Pineda Jaimes, Jorge Arturo; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]This monograph, focused on a case study, aims to solve a practical problem in the field of construction project management in the public sector. It proposes to address the implementation of the guidelines established in the sixth edition of the PMBOK during the execution stage of a specific project: the construction of the House of Culture of Acacias, Meta. This project also promises to contribute to solving practical and concrete problems for a variety of stakeholders, including communities, companies, and public entities. The implementation of good project management practices based on PMI can increase the probability of project success, which benefits communities by enabling them to access benefits faster, businesses by improving their competitiveness, and public entities by reducing costs and accelerating project completion.Ítem Incidencia de la inadecuada planificación del alcance, costo y tiempo; en un contrato de obra pública de conservación de infraestructura vial en BogotáRodríguez Gutiérrez, Edwin Aníbal; Gaitán Vega, Jhonatan Stivens; Pineda Jaimes, Jorge Arturo; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]When it comes to infrastructure projects for the public sector, success is sought through the specific achievement of objectives related to the proper use of public resources, within the deadlines and criteria specified by the contracting entity. This success depends on project management in terms of planning, organization, monitoring, and control of variables that influence execution. Therefore, the purpose of this thesis is to analyze the current state of the project being carried out under the construction contract No. 1711 of 2020, signed between the Urban Development Institute (IDU) and the CHI019 Consortium as the contracting company. The project aims to "preserve vehicular bridges in the city of Bogotá D.C." Although the contract is still in progress and within the established contractual period, it has numerous shortcomings that have hindered its optimal development. These deficiencies include, for example, the overestimation of the physical target value by the IDU, delays in the timely delivery of diagnostics and designs by the contractor for the bridges to be intervened, errors in the planning of the cost and time baseline caused by the overestimation of the works by the entity, and compliance with the entity's requirement to deliver a Detailed Work Plan (PDT), which was done with very low budgetary precision. Lastly, changes in the project scope that had to be modified during project execution. Following a detailed analysis of the project, the Earned Value Management (EVM) project management tool was employed. This tool provides quantitative parameters on the project's performance based on the planning, revealing cost and time deviations. This allowed for quick and effective decision-making to provide solutions for improving the project's conditions. The deviations encountered were discouraging, predicting the project would end with cost overruns and exorbitant losses outside the established deadlines. Therefore, project management tools such as Crashing and Fast Tracking were applied to intensify and expedite the project, respectively. This approach allowed for an exploration of ways to improve project conditions and achieve its termination in the best possible manner. In the end, the alternatives presented in this thesis were delivered to the executives and managers responsible on the part of the contracting company. These alternatives serve as options to successfully complete the project, meeting the objectives and scope set by the contracting entity. This approach aims to avoid negatively impacting the company and demonstrates the beneficial use of project management tools in enhancing project execution.Ítem Integración de Lean Construction y PMBOK VI edición en la etapa de ejecución de proyectosCastellanos Osorio, Sergio Andrés; Falla Muñoz, Daniel Fernando; Gómez Zárate, Fabián; Pineda Jaimes, Jorge Arturo; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]This work corresponds to a bibliographic review monograph that seeks to better understand how Lean Construction and the PMBOK structure work together to improve project management by exploring how they are integrated throughout the execution stage of the construction project.Ítem VII Congreso Internacional de Ingeniería Civil 2022: Compilación de memorias: Un aporte a la recuperación del país desde la academia, la investigación, la empresa y la institucionalidadPineda Jaimes, Jorge Arturo; Rincón Aguirre, Andrea Jhohana; Bonilla Parra, Manuela Alejandra; Useche Infante, Danny; Aiassa Martínez, Gonzalo; Arrua, Pedro; Eberhardt, Marcelo; Bernal López, Mauricio; Botero Jaramillo, Eduardo; Gómez Jiménez, Carlos Arturo; Acosta Pinzón, Juan David; Higuera Niño, Héctor; Ayala Bohórquez, Jefferson Arles; Piñeros Barreto, David Alberto; Zamudio Huertas, Eduardo; Sánchez Cotte, Edgar Humberto; Rondón Quintana, Hugo Alexander; Carreño García, Katerine; Maldonado Pérez, Cristian Camilo; Téllez Torres, Jhoan Sebastián; Pineda Jaimes, Jorge Arturo; Sánchez Galeano, Martha Andrea Carolina; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]; Rincón Aguirre, Andrea Jhohana [0000-0001-9442-9331]; Bonilla Parra, Manuela Alejandra [000-0002-7329-1895]; Useche Infante, Danny [0000-0002-3813-7307]; Bernal López, Mauricio [00000-0002-5281-4765]; Botero Jaramillo, Eduardo [0000-0002-3735-4158]; Gómez Jiménez, Carlos Arturo [0000-0002-8983-0144]; Ayala Bohórquez, Jefferson Arles [0000-0002-0520-9431]; Zamudio Huertas, Eduardo [0000-0002-9698-5419]; Rondón Quintana, Hugo Alexander [0000-0003-2946-9411]; Carreño García, Katerine [0000-0002-6553-4316]; Maldonado Pérez, Cristian Camilo [0000-0002-7150-8368]; Téllez Torres, Jhoan Sebastián [0000-0002-0302-8506]; Pineda Jaimes, Jorge Arturo [0000-0002-0953-9745]The Organizing Committee and the Editorial Committee of the VII International Congress of Civil Engineering organized by the Francisco José de Caldas District University “A contribution to the recovery of the country from Academia and Research” presents the serial publication associated with the event that contains the scientific and technical works of the most outstanding presentations of the event organized by the Technology in Civil Construction, Civil Engineering and Master's in Civil Engineering programs of the Technological Faculty. The objective of the congress is to discuss and publicize aspects and results of interest in different areas of Civil Engineering, seeking the dissemination of results of academic and professional impact.