Pasantía como auxiliar (residente de obra), supervisión y control de obra en la empresa Arquitectura Plus
Fecha
Autores
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
The economic planning in a work is of the utmost importance, since from there the economic parameters that establish whether the work is viable start, it also establishes criteria to grant the labor and material contracts necessary for the execution. The general budget of the work is the result of multiple studies and investigations that are carried out to determine the prices of the products in the market, the price of labor and the performance of these, in order to have control over expenses. that are generated during the work. Through the APU, Analysis of Unit Prices, all the data obtained related to the prices of labor and inputs can be better organized, through this process, in addition, direct and indirect costs are obtained in the preparation of each activity and its price per unit of measure. In this report you will find the development of the APU of the Strong Machine work, and the activities carried out to obtain it, as well as the way in which the prices were developed and sought and how they were related to the determination of the unit prices and the generation of the general budget.