Ejecución de obra: construcción del corredor vial av. Polo, conexión entre la av. libertadores y la av. Boyacá en la altura de la calle 201

Fecha

Autor corporativo

Título de la revista

ISSN de la revista

Título del volumen

Editor

Compartir

Altmetric

Resumen

The present document supports the internship carried out during the execution of work in the field work phase and support in topographic activities, in the construction of a road corridor with resources from the promoter Fidecomiso Lagos de Torca with the support of the urban development institute IDU. This road connection of 1.7 km is the main access road to the mega-project "Ciudad Lagos de Torca", which is the model of public-private participation in management of the District Administration to develop during the next 25 years, the northern edge of the city of Bogota.

Descripción

El presente documento sustenta la pasantía realizada durante la ejecución de obra en fase de trabajo en campo y apoyo en actividades topográficas, en la construcción de un corredor vial con recursos del promotor Fidecomiso Lagos de Torca con el acompañamiento del instituto de desarrollo urbano IDU. Esta conexión vial de 1,7 km lineales es la principal vía de acceso al megaproyecto “Ciudad Lagos de Torca”, la cual es el modelo de participación público-privado en gestión de la Administración Distrital para desarrollar durante los próximos 25 años, el borde norte de la ciudad de Bogotá.

Palabras clave

Topografía, Pasantía, Construcción, Corredor vial

Materias

Tecnología en Levantamientos Topográficos -- Tesis y disertaciones académicas , Carreteras -- Mantenimiento y reparación , Materiales para carreteras , Bogotá (Colombia) -- Desarrollo urbano

Citación