Instructivos para la Revisión Documental en Proyecto Eléctricos Objeto de Inspecciones RETIE
| dc.contributor.advisor | Toro Garzón, Juan Pablo | spa |
| dc.contributor.advisor | Avendaño Avendaño, Carlos Alberto | spa |
| dc.contributor.author | Arandia Pullido, Jhonny Leandro | spa |
| dc.contributor.author | Tenorio Simbaqueba, Jonathan Steven | spa |
| dc.date.accessioned | 2017-07-27T16:54:08Z | |
| dc.date.available | 2017-07-27T16:54:08Z | |
| dc.date.created | 2017-06-15 | spa |
| dc.description | El siguiente instructivo se realizo en base del proceso para realizar la revisión documental de los proyectos eléctricos que esperan un dictamen. Se menciona la documentación interna, registro fotográfico y memoria de cálculo del proyecto, para lo cual se tiene en cuenta procedimientos internos de la empresa, y requerimientos generales establecidos en el RETIE que aplican para dichos alcances, con el fin de contar con el material correcto y suficiente para dar soporte a un correspondiente dictamen emitido. Esta actividad de revisión se realiza por el área de comité de inspecciones de EINCE LTDA, quien verifica que la documentación coincida.El instructivo agrupa los elementos junto con sus características, que se espera anexar en la documentación de un proyecto de instalaciones eléctricas asociado al uso final, con el fin de contar con la documentación y registros suficientes que den soporte el dictamen de inspección emitido, lo anteriormente mencionado cobra mucha importancia debido a que el organismo de inspección está sometida a una evaluación constante por parte de la ONAC y la SIC.Proporcionar al área de comité de inspecciones una herramienta de apoyo para revisión documental de los proyectos, consignando en el instructivo: los diferentes criterios y requerimientos que el organismo de inspección ha ido estableciendo el desarrollo de su función, pues es importante que se estandaricen los criterios enfocados a mitigar el error de emitir un dictamen sin el sustento apropiado, que puede perjudicar el funcionamiento de EINCE LTDA. | spa |
| dc.description.abstract | The following instruction was made at the base of the process to carry out the documentary review of electrical projects awaiting an opinion. The internal documentation, the photographic register and the calculation report of the project are mentioned, taking into account the internal procedures of the company, and the general requirements established in the RETIO that apply to the scope, in order to count With the right material And enough to support an opinion issued. This inspection activity is carried out by the inspections committee area of EINCE LTDA, who verifies that the documentation coincides. The instructor groups the elements with their characteristics, which is expected in the documentation of a project of electrical installations associated with the final use, In order to have the documentation and records that support the opinion of the inspection issued, since the cobra is very important because the inspection body is subject to a constant evaluation by the ONAC and the SIC. Provide the inspection committee area of support tool for documentary review of projects, consignment in the instructive: the different criteria and requirements that the inspection body has been establishing the development of its function, so it is important that The criteria focused on mitigating the error of issuing an opinion without the adequate support, which may impair the functioning of EINCE LTDA. | spa |
| dc.format.mimetype | spa | |
| dc.identifier.uri | http://hdl.handle.net/11349/6068 | |
| dc.language.iso | spa | spa |
| dc.rights | Atribución-NoComercial-SinDerivadas 4.0 Internacional | * |
| dc.rights.acceso | Abierto (Texto Completo) | spa |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | spa |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
| dc.subject | Instalaciones | spa |
| dc.subject | Inspecciones | spa |
| dc.subject | Certificación | spa |
| dc.subject | RETIE2013 | spa |
| dc.subject | Dictamen | spa |
| dc.subject | NTC2050 | spa |
| dc.subject.keyword | Installation | spa |
| dc.subject.keyword | inspections | spa |
| dc.subject.keyword | Certification | spa |
| dc.subject.keyword | RETIE2013 | spa |
| dc.subject.keyword | Dictamen | spa |
| dc.subject.keyword | NTC2050 | spa |
| dc.subject.lemb | TECNOLOGÍA EN ELECTRICIDAD - TESIS Y DISERTACIONES ACADÉMICAS | spa |
| dc.subject.lemb | INSTALACIONES ELÉCTRICAS - MANUALES | spa |
| dc.subject.lemb | REDES ELÉCRTICAS - MANUALES | spa |
| dc.subject.lemb | DISTRIBUCIÓN DE ENERGÍA ELÉCTRICA - DOCUMENTACIÓN | spa |
| dc.title | Instructivos para la Revisión Documental en Proyecto Eléctricos Objeto de Inspecciones RETIE | spa |
| dc.title.titleenglish | Instructives for the Documentary Review in Electrical Projects Subject to RETIE Inspections | spa |
| dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | spa |
| dc.type.driver | info:eu-repo/semantics/bachelorThesis | spa |
Archivos
Bloque original
1 - 1 de 1
Cargando...
- Nombre:
- ArandiaPullidoJhonnyLeandro2017 .pdf
- Tamaño:
- 414.81 KB
- Formato:
- Adobe Portable Document Format
- Descripción:
- Trabajo de Grado
Bloque de licencias
1 - 1 de 1
No hay miniatura disponible
- Nombre:
- license.txt
- Tamaño:
- 7 KB
- Formato:
- Item-specific license agreed upon to submission
- Descripción:
