Pre-Factibilidad del Estudio de Implementación de la Autogeneración de Energía Eléctrica en la PTAP el Dorado de la EAB-ESP

Fecha

Autor corporativo

Título de la revista

ISSN de la revista

Título del volumen

Editor

Compartir

Altmetric

Resumen

Currently none of the treatment plants (PTAP and PTAR) or the different water systems of the EAB-ESP, are using self-generation systems for the use of water resources that are daily and 24 hours a day flowing through these facilities , With the exception of three PCH's that are in operation in the Chingaza System, in which approximately 1.322.000 cubic meters per day are flowing, which could produce approximately 65 MW, with the generation equipment by tidal power could be approximated To 20 MW, which would be sufficient for the supply of treatment plants.

Descripción

En la actualidad ninguna de las plantas de tratamiento (PTAP y PTAR) ni los diferentes sistemas hídricos de la EAB-ESP, están utilizando sistemas de autogeneración eléctrica para el aprovechamiento del recurso hídrico que diariamente y las 24 horas del día están fluyendo por estas instalaciones, con la excepción de tres PCH´s que están en funcionamiento en el Sistema Chingaza, en esta están fluyendo 1.322.000 metros cúbicos diarios aproximadamente, con lo que se podría producir aproximadamente 65 MW, con los equipos de generación por mareomotriz se podría aproximar a 20 MW, que sería suficiente para el suministro de las plantas de tratamiento.

Palabras clave

Autogeneración, Mareomotriz, Aprovechamiento de recursos, Recurso hídrico

Materias

ESPECIALIZACIÓN EN GESTIÓN DE PROYECTOS DE INGENIERÍA - TESIS Y DISERTACIONES ACADÉMICAS , DESARROLLO DE RECURSOS HÍDRICOS , GENERACIÓN DE ENERGÍA , ESTUDIOS DE FACTIBILIDAD

Citación