Pre-Factibilidad del Estudio de Implementación de la Autogeneración de Energía Eléctrica en la PTAP el Dorado de la EAB-ESP
Fecha
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Altmetric
Resumen
Currently none of the treatment plants (PTAP and PTAR) or the different water systems of the EAB-ESP, are using self-generation systems for the use of water resources that are daily and 24 hours a day flowing through these facilities , With the exception of three PCH's that are in operation in the Chingaza System, in which approximately 1.322.000 cubic meters per day are flowing, which could produce approximately 65 MW, with the generation equipment by tidal power could be approximated To 20 MW, which would be sufficient for the supply of treatment plants.
Descripción
En la actualidad ninguna de las plantas de tratamiento (PTAP y PTAR) ni los diferentes sistemas hídricos de la EAB-ESP, están utilizando sistemas de autogeneración eléctrica para el aprovechamiento del recurso hídrico que diariamente y las 24 horas del día están fluyendo por estas instalaciones, con la excepción de tres PCH´s que están en funcionamiento en el Sistema Chingaza, en esta están fluyendo 1.322.000 metros cúbicos diarios aproximadamente, con lo que se podría producir aproximadamente 65 MW, con los equipos de generación por mareomotriz se podría aproximar a 20 MW, que sería suficiente para el suministro de las plantas de tratamiento.
Palabras clave
Autogeneración, Mareomotriz, Aprovechamiento de recursos, Recurso hídrico