Formulación de estrategias socioambientales con criterios bioéticos para la sostenibilidad de la central hidroeléctrica Sogamoso, ubicada en el departamento de Santander, Colombia
Fecha
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
This project was developed with the purpose of generate a strategic analysis of environmental and social situation of hydroelectric central Sogamoso, located in the department of Santander, based on the application of bioethical principles for achieving sustainability in the area of influence of the project through the formulation of alternatives that contribute to environmental improvement, social development and economic growth of stakeholders involved in implementation. The development of this document will be done in three phases in which it will be carry out. As a first measure, it will elaborate an environmental and social diagnosis in the area of influence of Sogamoso hydroelectric power plant , through document review, checklist of different social and environmental aspects impacted by the implementation of hydroelectric in each of its stages, a matrix of impacts for the prioritization of the most significant affecting the sustainability of the area and finally, a interests and expectations matrix for identifying the stakeholders of hydroelectric. For the second phase, it will develop a strategic analysis for identifying the strategies will improve the hydroelectric and its effects, which will evaluated considering compliance with the criteria that compose each of the bioethical principles of precaution, usefulness, responsibility, justice and ethics of protection, those will be intended to include in the project's management. Finally, in the third phase, it will develop a balanced scorecard for environmental and social management of the Sogamoso hydroelectric power plant, which allows it to set the success factors for the desired future of the hydroelectric plant.