For this internship should take into account verification of designs, materials planning, manufacturing and assembly of the prototype for the release of assembly Tower type TXS2 which should be applied load testing in India with the company Kalpa Taru to confirm that the initial forces of the designs are completed, and once freed issued in Colombia. Serials of the respective structures of the project to enter the galvanized process analyzing the thickness structure to pack and ship by container To Panama which is the final destination of the 155 units of the towers type TXS2
Descripción
Para esta pasantía se debe tener en cuenta la verificación de diseños, la planeación de materiales, la fabricación y armado de prototipo para la liberación del ensamble de la Torre Tipo TXS2 la cual se debe aplicar la prueba de carga en la India con la empresa Kalpa Taru para confirmar que las fuerzas iniciales de los diseños se cumplan, así una vez liberada se emitan en Colombia los seriados de las respectivas estructuras del proyecto para entrar al proceso de galvanizado analizando el espesor en la estructura para poder embalar y enviar por contenedor a Panamá el cual es el destino final de las 155 unidades de las Torres Tipo TXS2.
Palabras clave
Seguimiento, Pasantía, Torres de Transmisión