Diseño e Implementación de Aplicación Android para Inventario Diario de Productos en Restaurantes Subway
Fecha
Autores
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
In order to contribute to the proper handling of raw materials and inventories to subway restaurants that receive monthly losses of up to 30% of their net profits due to procedural errors, misuse of the products and even theft. It has been decided to develop an application based on Android that allows to control daily a set of products that affect a large percentage of the losses that the subway restaurants throw weekly. Thus, it is intended to develop an application compatible with Android 4.1 (Jelly Bean-2012) and more recent, to show the losses or profits generated daily due to missing or leftovers of the most significant products in terms of costs of subway restaurants (bread , cookies, package potatoes and drinks), in order to take corrective actions and verify possible incorrect uses of raw materials or even robberies by employees. This application will allow you to manually enter the amount of existing product and calculate according to the sales of the day, the surplus or missing of each item. This project will be carried out through the free programming tool "app inventor" that allows a user friendly interaction, and will have as its initial purpose, the SUBWAY restaurant at the nitrate transport terminal, located at Diagonal 23 no 69 -55, module 2 local 103. The project includes the initiative to reactivate the utilities of the subway restaurants at a time when the economic recession and the increase of the dollar has forced the chain to close about 25 restaurants in Bogota, affecting the franchisees that are in principle contribute directly to GDP, and their taxes contribute to social projects and the development of the country. The results must be obtained in terms of compliance with the stipulated hours, the objectives, and the relationship with the expected product (design, prototype, user interface, final product, etc.), in addition to compliance with the work plan of activities and the presentation of a final report.
