Ejecución de instalación de tubería con pendientes altas y corrección de erradas
Fecha
Autores
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
This report reflects the initial activities carried out in the period from April 15 to May 19, 2024, development, progress, photos, and the learning obtained within the stipulated time according to the schedule proposed in the internship proposal already approved by the curricular project "Execution of installation of pipes with high slopes and correction of errors", where the progress of the work was executed in the Los Alpes neighborhood located in the town of Cuidad Bolívar with contract 1115 of 2023 with the District Secretariat of Habitat - SDHT, Empresa de Acueductos y Alcantarillado de Bogotá - EAAB. Also the surveying company ARQUITECTURA INGENIERIA Y TOPOGRAFIA SAS. Road segments 19011177, 19011328 were intervened in the installation of pipes, elimination of errors, fillings and road structure. The construction methodologies, defined designs and modifications that were made during the construction process are shown with the concept of each specialist in their area to guarantee its functionality.