Sistema de tratamiento autolavado samiwall
Fecha
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
The present project of degree we will realize a study, design, and construction of a WWTP in the car wash samywal located in the street 63b 28ª16 neighborhood Benjamin Herrera locality N ° 12 of neighborhoods united, UPZ N ° 98 los Alcazars, the project we will realize In three phases. In the first phase we will request the analysis of the current dumping of car wash, according to the results we proceed to design the type of treatment. Phase 2 to be able to design the type of treatment we will consult the RAS 2000 and the design criteria, to know what type of flow and treatment will be appropriate for this project. Phase 3 in this phase we will conclude the construction of our wastewater treatment system for this we will design the corresponding plans, time, space and the destination of human and economic resources that we will use in our project. In Phase 4, a characterization of water is requested to verify the efficiency and percentage of removal of the contaminant load.
