Gestión del riesgo financiero para proyecto Glamping tipo colmena, en Jardín Antioquia, Colombia
Fecha
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
Tourism development in the country is one of the most important axes that the government proposes to implement; today we usually see the construction of different tourism development projects in the different departments of the territory. Glamping is one of the many projects that are growing, which is why this monograph is developed based on a project of this type. Glamping is a project that comes from traditional camping or tents that have historically been used to have contact spaces with nature or change the city environment. The difference between Glamping and tents or camping is that Glamping is designed to offer an improved experience of comfort and with services that these tents do not have, these services are jacuzzi, catamaran nets, beds of excellent comfort among others, there is a wide variety of Glamping designs and models, therefore, further on Some of the models built or offered by the builder of the case study project will be mentioned. The project being studied is GLAMPING TIPO MENA, built by Engineer Oscar Fajardo, between July 2022 and November 2022, it is in the department of Antioquia, in the municipality of Jardín, and is at an approximate altitude of 1,718 meters above sea level in the area. rural, surrounded by large areas of crops and access roads to the door of the project. This project, as reported, presented a negative financial imbalance between what was budgeted and what was finally executed, which is why the monograph is oriented towards the management of financial risks for Glamping Tipo Colmena, because managing the risks in advance is possible to detect them, thus avoiding economic losses in the development of future projects. With this monograph, it is expected to present a sufficiently clear Financial Risk Management document for Beehive Type Glamping, where evidence is left of what type of financial risks affected the project, analyze them and plan a possible response to them.