Optimización en la gestión del acueducto y alcantarillado en Mosquera, Cundinamarca

Fecha

Autor corporativo

Título de la revista

ISSN de la revista

Título del volumen

Editor

Compartir

Altmetric

Resumen

This report summarizes the activities carried out during the internship at the Mosquera Aqueduct and Sewer Company (EAMOS ESP), focused on improving the hydraulic infrastructure and sanitation of the municipality. Technical support was provided in the expansion of the Puentes Wastewater Treatment Plant (WWTP), Phase II, to increase its capacity to 400 L/s and comply with environmental regulations. In addition, work was done on hydraulic sectorization and the installation of pressure gauges to improve the aqueduct network. Maintenance work was also supervised and administrative tasks were managed, highlighting the development of technical skills and their impact on municipal infrastructure.

Descripción

Este informe resume las actividades realizadas durante la pasantía en la Empresa de Acueducto y Alcantarillado de Mosquera (EAMOS ESP), enfocadas en mejorar la infraestructura hidráulica y el saneamiento del municipio. Se brindó apoyo técnico en la ampliación de la Planta de Tratamiento de Aguas Residuales (PTAR) Puentes, Fase II, para aumentar su capacidad a 400 L/s y cumplir con la normativa ambiental. Además, se trabajó en la sectorización hidráulica y la instalación de medidores de presión para mejorar la red de acueducto. También se supervisaron labores de mantenimiento y se gestionaron tareas administrativas, destacando el desarrollo de habilidades técnicas y su impacto en la infraestructura municipal.

Palabras clave

Ampliación PTAR, Medidores de presión, Sostenibilidad hídrica, Infraestructura acueducto, Gestión de aguas residuales

Citación