Auxiliares de ingeniería topográfica en el control de adecuación hidráulica del río Subachoque
Fecha
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
For the development of this project, a series of activities were carried out, thus obtaining its methodology. In the first activity, the interns linked to the company Services in Geomatics and Engineering, students of the Francisco José de Caldas District University, establish the control points to carry out the drone flight and obtain the orthophoto of the project location. In the second activity, the interns make the post process of the base points for the survey carried out in the field by the surveyors and commissions in charge of sending information to the office so that the students carry out the processing of the points raised. As the last activity in the office carried out by the interns for the development of the project in charge of the company presented, there is the generation, execution and analysis of a TIN that includes all the design and dredging information executed for this project, To collect the data and perform its proper processing and analysis by the interns, the surveyor and his commission, locate and materialize the initial abscissa of dredging, Once excavated, the check is made with a level of precision, to compare with Design dimensions, likewise measure the bottom of the river, comparing with the design distance. Said dredging is at a constant check to comply with the design proposed by the hydraulic engineer, verifying the advances with topographic surveys carried out with GNSS receivers in RTK mode, the above in the company of the audit for the reconciliation of data obtained from the field, in addition of a second review filter in the office where our work described above will be displayed.
