Diseño y aplicación de protocolos de pruebas SAT del sistema de protección, control, medida y comunicaciones para la S/E Barzalosa
Fecha
Autores
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
This document details the development and execution of the protection, control, measurement, and communication system for the new Barzalosa 115/34.5 kV digital substation, including the connected substations Flandes and La Guaca. To ensure an effective system supply, it is essential to follow a well-defined scope covering everything from engineering to commissioning, respecting all intermediate stages, such as FAT and SAT tests. This work focuses specifically on the SAT and commissioning phases, which closely depend on the preceding stages. Throughout the document, various engineering services will be explored, ranging from creating blueprints to formulating protocols, laying the foundation for SAT tests. Once completed, it concludes with the necessary documentation supporting the operation and service of the substation, meeting both customer needs and external regulations. In essence, the purpose is to provide an academic and detailed insight into the implementation and operability of a digital system in an electrical substation.