Pasantia en el Marco de Interventoria Suscrito Entre la Alcaldia Menor de Kennedy y el Idexud
Fecha
Autores
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
Process development internship gave thanks to administrative agreement No. 119 of 2015 signed between the University Francisco Jose de Caldas and local development fund of Kennedy which aims to make the technical, administrative, environmental, social auditing, legal and financial contracts arising from the contractual process. The overall objective of this agreement is to carry out the study and designs for the maintenance and rehabilitation of the road network of the town of Kennedy which is divided into two groups. Through IDEXUD students of the district college can be linked to this contract as interns to get your undergraduate degree the minimum time that must be taken to aspire to the title is 192 hours as described in the agreement 038 of 2015 issued by the university board of governors of the university district. In this contract it has lots of fronts open play at the same time which is difficult to keep good control, this is for this contract interventoría has few resident engineers for visits, for this problem is that accessed interns so that through them you can have a more effective control of work and the resident engineer in addition to their regular visits will always be aware of the state of the work by the intern. In this work will make a description of the process carried out in internships in my case. Internships in my case were taken in Class neighborhood of the town of Kennedy and during the process I was assigned two work fronts, one located in the race 81 and another on the diagonal 57 both in the same neighborhood. In 81 career he had to perform paving 4 rubber grain on the diagonal 57 CIV only had a CIV is in charge, as the main function was to keep a check on the fronts.
