Diseño y evaluación de un modelo de programación y control de producción basado en teoría de restricciones y validado mediante simulación discreta: caso práctico productora de cables ABC
Fecha
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
In this project the problem of factory production scheduling addresses with type of production workshop, which develops itself as a case study in The Studio Cable. Financial Problems In this company is evident and return on investment, since not the master production plan is fulfilled and high levels of inventory in process have. Solution esta problematic as the authors of the research programming model control and production based on Theory of Constraints and validated using discrete simulation applicable to the Company UN Under study they designed. The project begins with the collection of all data associated with the production schedule, tales of how labor standards, programming rules of the plant, and the results of the main management indicators During the analysis period, THEN DESIGN, Valid he built and the simulation model of the Programming repre Company Object of study. With esta información Policy-based Production Scheduling Principles para theory Restrictions Percentage Increase Compliance Production Master Plan, the net income and the percentage of return on investment and Validation para subsequent simulation were designed. The results of the proposed strategies were compared with those of the real system, which was demonstrated a significant improvement in management indicators analyzed.
