Prefactibilidad de la implementación de sistemas de generación fotovoltaica en empresas de la zona industrial de Puente Aranda en la Ciudad de Bogotá
Fecha
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
The project is formulated for the purpose of knowing how profitable can be for companies that are located in the area of Puente Aranda, implement photovoltaic generation systems within the organization for electric power consumption from an economic point of view , environmental, social and future use. To carry out the pre-feasibility study primary and secondary information rose to determine the number of companies interested in implementing alternative energy, with economic potential acquisition and complying with the technical conditions, enabling the design of a possible system that would accommodate with the identified needs. The use of electronic devices that meet the specifications of energy identified in the market study and other aspects that are relevant to the sector companies arises; and from the use of these devices an economic proposal is generated with the system value for the companies Given data and values identified in the market study to identify the amount of energy needed to generate, store and regulate. The economic proposal contains the five-year projections of the potential gains in companies because of savings and generation of electricity from photovoltaic system designed. In addition, this proposal is built taking into account the benefits that could get a company to implement these technologies. Finally there are a number of recommendations of applications and system improvements for businesses, taking into account important aspects so that the electric power service in each of them is continuous and quality.
