Levantamiento y diseño detallado de las obras civiles en la subestación eléctrica San Marcos 500kv
Fecha
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
This monograph of degree work is the result of the work carried out in the internship process at the San Marcos 500 KV Electrical Substation located in Mulaló, municipality of Yumbo (Valle del Cauca), around the survey and detailed design of civil works using conventional topography and modern methods such as the use of drones, surveying with GNSS antennas by RTK method; in order to obtain a more precise product, which meets the regularities and technical requirements to develop a digitized design and the corresponding plans of the area in question, based on the expansion expressed in the third transmission plan of the National Planning Department of the Republic of Colombia, issued in the CONPES document of October 19, 1993; In this sense, an inventory of equipment and structures was provided throughout the study area, which will facilitate the expansion of the 500 KV patio, in addition to the planimetric and altimetric precision obtained for the geodetic points marked off.