Levantamientos topográficos en la empresa Topdigital EU
Fecha
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
In the internship, three topographic surveys were carried out for three different projects, the first was an uprising of the Valle del Cafam neighborhood in the town of Usme, called the "Milan Project", which consisted of a survey which included the inspection of wells in the area. of interest. A similar topographic survey called the "Don Bosco School" was also carried out, located on 26th Street and Rojas Avenue. This also included the removal of all the trees inside the school, for a study of possible extra construction within the school. The third survey in career 30 with 26th Street, where the survey and survey of wells was taken as a priority, this project was called "Project Museum of Memory", these surveys were georeferenced with GPS positioning and planimetric and altimetric control.