Metodología orientada a la interventoría administrativa para el control de proyectos en fase de ejecución en edificaciones con estructura metálica en pórtico arriostrado concentrico caso de estudio Centro de Salud Gachancipá.
Fecha
Autores
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
This project is presented as an application monograph, with the objective of preparing instructions for the control of administrative auditing in projects of metal structures in braced porches in the execution phase for the municipal health center of the municipality of Gachancipá, taking into account It takes into account the risks that are identified in the projects in aspects of schedule control or execution times and scope of the work for the audit. The purpose of this monograph is to address the problems surrounding the detection and intervention of the intervention in the face of administrative risks in a project focused on metal structures, where we encounter barriers when controlling a work, in this case in its construction stage. execution, which is in turn where the greatest number of variables to be considered for a project are manifested, therefore it is considered pertinent to develop strategies to face these variables, this in order to mitigate delays in time or reduction in the scope of a project. , in turn we find an increase in the construction of metal structures since the 90s in the country, putting this type of structures more and more in the panorama of the audit. As a product of this monograph, an instruction manual is presented, which indicates the parameters to be taken into account to identify the problems in a project, thereby seeking to control the schedule and scope of a project on this page. 7 taking as principles the PMBOK and the Pareto principle. The product that will be obtained from this exercise will be (1) an instruction manual, and several Excel tables which will give us percentages to understand the status of the project.