Instalación y reparación de redes residuales y plubiales en la localidad de Usme
Fecha
Autores
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
This report reflects the initial activities carried out in the period from July 29 to September 19, 2024, progress, photos and learning that was obtained in the stipulated time according to the schedule set out in the internship proposal already approved by the curriculum project “Installation and repair of sewage and rainwater networks in the town of Usme”, where the progress of the work was executed in the neighborhood cantarrana, the hamlet, el piojo and monte blanco located in the town of Usme with the contract with the EAAB. The topography company ARQUITECTURA INGENIERIA Y TOPOGRAFIA SAS. Se The following road segments were intervened: cantarrana neighborhood and park, el caserío, el piojo and monte blanco in the installation of pipes, elimination of erradas. We show the construction methodologies, defined designs and the modifications that were made in the middle of the construction process with the concept of each specialist in their area to ensure the functionality of the same.