Optimización de la gestión de alcance, costo y tiempo en la construcción de la E.S.E. Cayetano María Rojas en El Peñón, Cundinamarca mediante BIM frente a la metodología tradicional
Fecha
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Universidad Distrital Francisco José de Caldas
Compartir
Director
Altmetric
Resumen
The project seeks to evaluate the feasibility of implementing BIM (Building Information Modeling) compared to the traditional methodology, applying various tools in the design of the new headquarters of the E.S.E. Cayetano María. It seeks to optimize the planning and control of scope, cost and time, highlighting the benefits of BIM such as the reduction of errors, better communication and efficient use of resources, as well as the challenges of its implementation. The analysis is based on an existing construction case, using plans, budgets and additional information. In addition, a virtual platform is used that integrates the stages of the project, addressing the limited adoption of BIM in the Colombian public sector.
Descripción
El proyecto busca evaluar la viabilidad de implementar BIM (Building Information Modeling) en comparación con la metodología tradicional, aplicando diversas herramientas en el diseño de la nueva sede de la E.S.E. Cayetano María. Se busca optimizar la planificación y control del alcance, costo y tiempo, destacando los beneficios de BIM como la reducción de errores, mejor comunicación y uso eficiente de recursos, así como los desafíos de su implementación. El análisis se basa en un caso de construcción existente, utilizando planos, presupuestos e información adicional. Además, se emplea una plataforma virtual que integra las etapas del proyecto, abordando la limitada adopción de BIM en el sector público colombiano.
Palabras clave
BIM (Building Information Modeling), Gestión de proyectos, Línea base alcance, Línea base costo, Línea base tiempo