Examinando por Autor "Garcia Triana, Carlos Alfredo"
Mostrando 1 - 1 de 1
- Resultados por página
- Opciones de ordenación
Ítem Pasantia como Auxiliar de Interventoria en Obras de Estabilización de Taludes Realizadas Bajo el Convenio Interadministrativo Entre la Universidad Distrital y la Alcaldia Local de Rafael Uribe UribeGarcia Triana, Carlos Alfredo; Villota Posso, Hernando VillotaIn the work carried out in the form of internships at the inter-administrative agreements 060-2013 and 061-2013 between the university and the local mayoral of Rafael Uribe Uribe, it aims to develop technical auditing activities to slope stabilization works carried out under Public works contracts 002 de No. 2013 and No. 060 of 2013. During the internship were performed activities such as taking photographic and written record of the activities that were implemented in work, measure built area for cutting work elements, visual supervision of construction activities that were performed, running reports they were made monthly and fortnightly where evidenced the progress of work, downloading photographic record in the database of auditing, monitoring in important activities in each front work, etc. Within the period of internship were performed all these activities of adequate and timely manner, with the constant support of the business tutor, who indicated that it was the right way to perform the proposed tasks. The most important activities that were monitored were build embankments, drilling for installation of active and passive anchors, installing mesh Tecco, construction of transport systems rainwater, etc. At the beginning of the internship, was required lot of support from the business tutor, as being the trainee in a job that did not know and exercise unfamiliar tasks, a constant accompaniment of someone to show him the most important aspects in the construction of elements that were developing in the work so that these are executed in a correct manner. The challenges Were presented During the internship Were Given more by the location of the fronts of work by the Difficulties Which Arise in them, since the lack of internal transport and insecurity in the area, it was Sometimes very difficult to get to monitor some of the work fronts, it is clear That Also one of the contractors no presence of someone to lead and organize the staff, 6 as the site supervisor was always absent and there was no one to replace it, Therefore Performed tasks Inadequate and disorganized. One of the biggest problems was evident within the auditing was his mess, then what will be done physically it done bad, ie, although reports, photographic records, court proceedings, etc. is handled in a proper way digitally, the processing of log and taking field measurements were made in a disorganized way, scoring in places that did not match, with the result that sometimes the information is misinterpreted or this was lost. Because of this failure was suggested to implement a series of formats that help record the information in order to have an orderly and accurate diversity important data for registration of the auditing.