Estrategia para el control y seguimiento de la interventoría técnica, para la construcción de edificaciones vis en mampostería parcialmente reforzada
Fecha
Autores
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Resumen
Each construction project has a process of carrying out activities, which are constituted and directed in order to successfully complete the work. In the development of the activities, a very important role is played by the construction and audit inspectors, since they are the ones who ensure that the construction is being fully carried out, taking as reference the work booklet supported by the designer. The inspection by the Auditor of the construction processes and of each of the materials that make up the structure that have physical and chemical properties, such as vertical perforation masonry, grafils with variable diameters in the horizontal part according to the designer, mortar of glue, reinforcing steel that are conditioned in the NSR 10 standard. Using review methods in the development of construction activities helps optimize the processes in a work, gives reliability of the quality of the structure, these methods can be represented in manuals or guides that are easy to understand for the professional in charge who represents a audit or construction inspector, strengthens knowledge and provides security of the activities carried out. Taking into account that there are various construction systems using masonry, each of the parameters given by the standard (NSR 10) will be taken as a reference. Title D), (Colombian NTC Technical Standard 4026) Through this application monograph proposal, we seek to optimize and provide an inspection strategy with a guide that allows the professional construction and audit inspector to ensure that the activities were carried out according to the designs, complying with the established construction standards with partially reinforced structural masonry.