Junta de obras Públicas. Informe
Fecha
Autores
Autor corporativo
Título de la revista
ISSN de la revista
Título del volumen
Editor
Compartir
Director
Altmetric
Archivos
Resumen
The image presents a news item about: “Public Works Board. Report." Republic of Colombia - Department of Cundinamarca - Board of public works - municipal engineering - Bogotá February 13, 1892 To the Secretary of the Honorable Municipal Council Present. I have the honor of informing the Honorable Municipal Council of the works carried out in the city by order of the Public Works Board, in the month of January of this year. pavements. The following were built: in block 7 of carrera 11.ª, sixty square meters including tiles and gutters; In the 10 block of 7th street, fifteen linear meters along the entire width of the street; in the 12 block of 12th street seventy longitudinal meters in the entire length of the block; in the 19th block of the 9th race, twenty-two linear meters; fifteen meters on the 7th block of 19th Street; sixty linear meters in the entire width of block 3 of 9th street and ten meters in block 2 of 24th street. Land was distributed and the northern end of block 9 of 13th street was leveled. damage repairs in block 2 of calle 19, and in block 8 of carrera 9.ª sewers. 14 meters of pipes were built at the intersection of Calle 19 and Carrera 10.ª; ten meters on 24th street, block 2; seventy meters on block 3 of 9th street and five meters on 9th street of 10th street; The channel of the pipes in blocks 3 and 4 of 6th street (Belén street) was repaired, and repairs were made in the 9th block of 4th race and in the 8th block of 9th race Walls and bridges. In the 10 block of the 9th race, twenty-two linear meters; fifteen meters on the 7th block of 19th Street; sixty linear meters in its entire width of the 3rd block of 9th street, and ten meters of the 2nd block of 24th street. Land was distributed and the northern end of block 9 of the 13th race was leveled. Damage repairs were made to the 2nd block of 19th street. And in the 8th block of 9th street. Forty-five cubic meters of ordinary masonry were built on the southern bank of the San Agustín river, block 3 of 7th street, and in block 4 of the same street the foundations of the wall that stands there were finished, and I repair the pavement of the Maza bridge. Special Works. The plastering and plastering of the walls of the San Juan de Dios temple was finished; the public toilets are over the race 12th block 1st I am attentive servant, B. Rentería Published in the newspaper Bogota Municipal Registry No. 580 February 24 1893 Page 3354
