Login
FAQ

Repositorio Institucional

View Item 
  •   DSpace Home
  • Trabajos de grado
  • Facultad de Tecnología Politécnica / Tecnológica
  • Tecnología en Construcciones Civiles
  • View Item
  •   DSpace Home
  • Trabajos de grado
  • Facultad de Tecnología Politécnica / Tecnológica
  • Tecnología en Construcciones Civiles
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Pasantía en Desarrollo e Implementación de un Formato para Control de Costos en la Segunda Etapa del Proyecto Condominio Casas del Campo.

Thumbnail
View/Open
Trabajo de Grado (6.180Mb)
Licencia y Autorizacion del Autor para publicar, Juliana González.pdf (1.330Mb)
Author
González Oliveros, Juliana Catherine
Metadata
Show full item record
Documents PDF

Abstract

The company Constructora Casas del Campo was initially created for the construction of the project Casas del Campo Condominium, however it is currently planned to keep ok developing more works similar to this one. The construction company is linked to the company S2R INGENIEROS SA. Which has 20 years of experience. This company is dedicated to the design, consulting and construction of hydraulic, sanitary, gas, fire systems, aqueduct and sewage systems. By the middle of 2016, the first stage of the project was being finalized, and the structure of the second phase was beginning, so taking into account that costs were exceeded in the first stage, this was the opportune moment to make a Budget control in the second stage is where the intern Juliana González Oliveros will develop the activities corresponding to the control of costs and budgets and auxiliary resident. The budget control and monitoring of a project designed to solve the problems that may possibly present, together with the budget control was made a change in the costs Direct.

Abstract

The company Constructora Casas del Campo was initially created for the construction of the project Casas del Campo Condominium, however it is currently planned to keep ok developing more works similar to this one. The construction company is linked to the company S2R INGENIEROS SA. Which has 20 years of experience. This company is dedicated to the design, consulting and construction of hydraulic, sanitary, gas, fire systems, aqueduct and sewage systems. By the middle of 2016, the first stage of the project was being finalized, and the structure of the second phase was beginning, so taking into account that costs were exceeded in the first stage, this was the opportune moment to make a Budget control in the second stage is where the intern Juliana González Oliveros will develop the activities corresponding to the control of costs and budgets and auxiliary resident. The budget control and monitoring of a project designed to solve the problems that may possibly present, together with the budget control was made a change in the costs Direct.
URI
http://hdl.handle.net/11349/8372
Collections
  • Tecnología en Construcciones Civiles [317]

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister

Universidad Distrital Francisco José de Caldas - Biblioteca UDFJC

Institución de Educación Superior sujeta a inspección y vigilancia por el Ministerio de Educación Nacional | Acuerdo de creación N° 10 de 1948 del Concejo de Bogotá  | Acreditación Institucional de Alta Calidad - Resolución N° 23096 del 15 de diciembre del 2016

 Calle 13 No. 31 - 75 Bogotá D.C. - República de Colombia |  (+57 1) 3239300  |  Lunes a viernes de 8 a.m. a 5 p.m.